




The existing End of Trip (EOT) facilities were thoughtfully reconfigured from a shared change room and locker layout into dedicated male and female amenities, each incorporating new showers, toilets and changerooms. A shared stretching area and a tenant water point were also introduced, enhancing functionality and supporting the daily needs of building occupants.
The works required extensive re-routing and relocation of existing services below the slab, with precise concrete cutting and infill undertaken to accommodate new service runs and fixture locations. The interior design was carefully developed to integrate with the building’s heritage character, combining natural materials with a contemporary beige palette to create a calm, refined environment. In addition, the project included an upgrade to the ground floor lift lobby, delivering a cohesive, elevated arrival experience that complements the upgraded EOT facilities.







Ready to imagine your unimaginable?
Call us, email us, write to us! We can’t wait to hear from you.